Sl. No Case No. Date Matter
61. OA-441/22-23 Wednesday, May 3, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY HALDIA ENERGY LIMITED (HEL) FOR IN-PRINCIPLE APPROVAL OF CAPITAL EXPENDITURE ON ACCOUNT OF MEETING EMISSION STANDARDS OF OXIDES OF NITROGEN IN COMPLIANCE WITH THE ENVIRONMENT (PROTECTION) RULES, 1986 AND AMENDEMENTS THEREOF NOTIFIED BY THE MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE UNDER THE ENVIRONMENT (PROTECTION) ACT, 1986 FOR 2 X 300 MW COAL BASED THERMAL POWER PROJECT AT HALDIA
62. OA-428/22-23 Monday, April 24, 2023 AFFIDAVIT FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL), IN TERMS OF THE DISPENSATION ENVISAGED BY THE HON'BLE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN ITS ORDER DATED 03.02.2022 IN CASES NO. FPPCA-80/16-17 AND APR-55/16-17, IN ORDER TO BRING ON RECORD ADDITIONAL DOCUMENTS/DETAILS IN RELATION TO THE EXPENSES INCURRED BY WBSEDCL ON ACCOUNT OF BREAKDOWN MAINTENANCE OF UNIT 2 & 4 OF PURULIA PUMPED STORAGE PROJECT (PPSP) AND THE DELAYED PAYMENT MADE TO TAISEI CORPORATION BY WBSEDCL
63. OA-440/22-23 Thursday, March 23, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) ON 22.12.2022 SEEKING CLARIFICATION/INTERPRETATION OF REGULATION NO. 18.2.1(H) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2022 IN RESPECT TO APPLICABILITY OF INTRA-STATE TRANSMISSION CHARGES FOR WIND-SOLAR HYBRID RENEWABLE ENERGY
64. PPA-94/18-19 (VOL. II) Thursday, March 23, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR APPROVAL OF FIRST SUPPLIMENTARY AGREEMENT EXECUTED ON 31.01.2023 TO THE POWER PURCHASE AGREEMENT DATED 08.01.2019 (PRINCIPAL AGREEMENT) EXECUTED BY AND BETWEEN TATA POWER TRADING COMPANY LIMITED (TPTCL) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR PURCHASE OF 126 MW POWER FROM DAGACHHU HYDRO POWER CORPORATION FROM ITS HYDRO PLANT AT KHEBISA GEWOG, DAGANA, BHUTAN FOR THE PERIOD FROM 01.03.2023 TO 29.02.2028 IN TERMS OF REGULATION 7.4.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED
65. CORRIGENDUM TO THE INTERIM ORDER DATED 09.02.2023 OF THE COMMISSION IN CASE NO OA-341/20-21 Tuesday, February 21, 2023 CORRIGENDUM TO THE INTERIM ORDER DATED 09.02.2023 OF THE COMMISSION IN CASE NO OA-341/20-21 BETWEEN PHILIPS CARBON BLACK LIMITED (PETITIONER) AND WBSEDCL,WBSETCL,DPL,WBSLDC AND RPG POWER TRADING COMPANY LIMITED (ALL RESPONDENTS)
66. OA-426/22-23 Monday, February 20, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (WBSETCL) FOR APPROVAL OF INCURRING CAPITAL EXPENDITURE OF AN ESTIMATED COST RS. 22875.92 LAKH FOR IMPLEMENTATION OF DIFFERENT TRANSMISSION SCHEME IN TERMS OF REGULATION 2.8.2.3 AND PARAGRAPH 4.1 (VI) OF SCHEDULE - 2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED
67. OA-396/21-22 Monday, February 20, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (WBSETCL) FOR APPROVAL OF INCURRING CAPITAL EXPENDITURE OF AN ESTIMATED COST OF RS. 22,166.00 LAKH FOR CONSTRUCTION OF 01 NO. 220/33KV GAS INSULATED SUB-STATION AT KHANAKUL & ASOCIATED TRANSMISSION SYSTEM IN TERMS OF REGULATION 2.8.2.3 AND PARAGRAP 4.1 (VI) OF SCHEDULE -2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITION OF TARIFF) REGULATIONS, 2011, AS AMENDED
68. OA-433/22-23 Monday, February 20, 2023 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (WBSETCL) FOR APPROVAL OF INCURRING CAPITAL EXPENDITURE OF AN ESTIMATED COST OF RS. 23883.42 LAKH FOR IMPLEMENTATION OF DIFFERENT NEW TRANSMISSION SCHEME IN TERMS OF REGULATION 2.8.2.3 AND PARAGRAPH 4.1 (VI) OF SCHEDULE - 2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITION OF TARIFF) REGULATIONS, 2011, AS AMENDED
69. OA-341/20-21 Thursday, February 9, 2023 IN THE MATTER OF APPLICATION UNDER SECTION 86(1)(a) READ WITH SECTION 86(1)(f) OF THE ELECTRICITY ACT, 2003 FOR ADJUDICATION OF DISPUTES BETWEEN PHILIPS CARBON BLACK LIMITED [PCBL (PETITIONER)] AND WEST BENGAL STATE ELCTRICITY DISTRIBUTION COMPANY LIMITED [WBSEDCL (RESPONDENT NO.1] VERSUS WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED [WBSETCL(RESPONDENT NO.2]) IN REGARD TO DETERMINATION/COLLECTION OF CHARGES PAYABLE BY THE PETITIONER TO THE RESPONDENT NO.1, IF ANY, FOR CONVEYANCE OF SURPLUS POWER FROM PETITIONER'S CO-GENERATION PLANT THROUGH OPEN ACCESS PURSUANT TO THE RESTRUCTURING OF ERSTWHILE DURGAPUR PROJECTS LIMITED (DPL)
70. OA-391/21-22 Thursday, December 15, 2022 IN REGARD TO THE APPLICATION IN TERMS OF CLAUSES 8.3 AND 8.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AND 2.1.3(C) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 WITH A PRAYER TO DIRECT DAMODAR VALLEY CORPORATION TO REDUCE THE RATE OF INTEREST ON DELAYED PAYMENT SURCHARGE AT LEAST @3% PER ANNUM
71. PPA-115/21-22 Monday, December 12, 2022 IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) FOR APPROVAL OF POWER SALE AGREEMENT EXECUTED ON 19.07.2021 BY AND BETWEEN IPCL AND SOLAR ENERGY CORPORATION OF INDIA LIMITED (SECI) FOR PURCHASE OF 100 MW RTC - RE POWER BY IPCL , FOR A PERIOD OF 25 YEARS UNDER SUB-SECTION (1) OF SECTION 86 OF THE ELECTRICITY ACT, 2003 AND IN TERMS OF REGULATIONS 2.1.12,7.4.1,7.8.1 AND 7.8.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED
72. B-70/2 Tuesday, December 6, 2022 IN REGARD TO THE APPLICATION OF SLDC REGARDING GUIDELINES FOR IMPLEMENTATION AND SMOOTH TRANSITION OF STATE LEVEL ACCOUNTS FOR DEVIATION SETTLEMENT CHARGES IN VIEW OF THE CENTRAL ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2022
73. OA-407/21-22 Wednesday, November 23, 2022 IN REGARD TO THE APPLICATION FOR INVESTMENT APPROVAL IN RESPECT OF 'CIVIL CAPITAL WORKS UNDER SYSTEM IMPROVEMENT SCHEME' OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) IN TERMS OF REGULATIONS 2.8.4.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED FROM TIME TO TIME
74. OA-432/22-23 Wednesday, November 16, 2022 IN REGARD TO THE APPLICATION FOR ISSUANCE OF APPROPRIATE ORDER FOR FIXATION OF PROPORTIONATE SHARE OF RAILWAY AGAINST ANNUAL PERFORMANCE REVIEW (APR) ORDER OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2018-19 AND 2019-20
75. WBERC/OA-340/20-21 Monday, November 14, 2022 APPLICATION MADE BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER UNDER REGULATION 2.1.3 (C) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 AS AMENDED REGARDING HIGH ENERGY COST OF THERMAL POWER STATION LOCATED AT RAGHUNATHPUR , PURULIA DISTRICT, WEST BENGAL (RTPS) OF DAMODAR VALLEY CORPORATION (DVC).
76. WBERC/AT-63 Monday, November 7, 2022 PETITIONS FILED BY DAMODAR VALLEY CORPORATION (DVC) AND DAMODAR VALLEY POWER CONSUMERS' ASSOCIATION (DVPCA) BEFORE THE HON'BLE APPELATE TRIBUNAL FOR ELECTRCITY (APTEL) IN APPEALS NO. 263 OF 2015 AND 275 OF 2015 RESPECTIVELY CHALLENGING THE ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COMMISSION) ISSUED VIDE DATED 24.08.2015 DETERMINING THE ANNUAL REVENUE REQUIREMENT (ARR) FOR THE FINANCIAL YEARS 2009-2010 TO 2013-2014 AND RETAIL SUPPLY TARIFF FOR FINANCIAL YEAR 2013-2014
77. OA-353/20-21 Thursday, November 3, 2022 IN REGARD TO THE APPLICATION FOR APPROVAL OF ALLOWING ADDITIONAL WORKING CAPITAL REQUIREMENT TO MEET THE REVENUE GAP OWING TO POOR REVENUE COLLECTION DUE TO COVID 19 PANDEMIC
78. PPA-74/14-15(VOL.II) Thursday, November 3, 2022 IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF THE SECOND SUPPLEMENTARY AGREEMENT TO POWER PURCHASE AGREEMENT DATED 11.12.2010 ANS SUBSEQUENT FIRST SUPPLEMENTARY AGREEMENT DATED 17.03.2017 AND ITS AMENDMENT DATED 03.11.2020 EXECUTED BY AND BETWEEN M/S BENGAL ENERGY LIMITED (BEL) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR A PERIOD OF ONE YEAR ( UPTO 16.03.2023)
79. OA-397/21-22 Thursday, November 3, 2022 APPLICATION FOR ISSUANCE OF APPROPRIATE ORDER IN TERMS OF 20(A) OF WBERC (RECOVERY OF EXPENDITURE FOR PROVIDING NEW CONNECTIONS) REGULATIONS, 2013 AS AMENDED, TO REDUCE SUPERVISION CHARGES FROM 15% TO 10% OF THE TOTAL ESTIMATED COST OF MATERIALS AND LABOUR AS PER COST SCHEDULE FOR DEVELOPMENT OF ELECTRICAL INFRASTRUCTURE TOWARDS EFFECTING NEW SERVICE CONNECTION UNDER WBSEDCL.
80. OA-391/21-22 Friday, October 14, 2022 IN THE MATTER OF APPLICATION IN TERMS OF CLAUSES 8.3 AND 8.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AND 2.1.3(C) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 WITH A PRAYER TO DIRECT DAMODAR VALLEY CORPORATION TO REDUCE THE RATE OF INTEREST ON DELAYED PAYMENT SURCHARGE AT LEAST @ 3% PER ANNUM
81. OA-393/21-22 Wednesday, September 28, 2022 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ALLOWING INTEREST AND ALLIED FINANCING CHARGES DUE TO LIQUIDATION OF OUTSTANDING TERM LOAN OF RURAL ELECTRIFICATION CORPORATION LIMITED (RECL) THROUGH TAKEOVER BY BANK OF BARODA IN THE AGGREGATED REVENUE REQUIREMENT OF RELEVANT YEAR
82. OA-422/22-23 Tuesday, September 27, 2022 IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER ALLOWING AN EXPENDITURE OF RS. 50.94 LAKH AS RESEARCH AND DEVELOPMENT EXPENDITURE IN TERMS OF REGULATION 5.21.1 OF THE TARIFF REGULATIONS OF THE COMMISSION DUE TO DROPPED HYDRO PROJECTS VIZ. PEDONG SMALL HYDROELECTRIC PROJECT, RAGNU SMALL HYDROELECTRIC PROJECT AND FARAKKA HYDRO ELECTRIC PROJECT UNDER JURISDICTION OF WBSEDCL.
83. OA-88/10-11/3 Tuesday, September 27, 2022 IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF MODIFICATION OF SIMPLIFIED FORMS FOR PROVIDING NEW CONNECTION / EXTENSION OF LOAD, CHANGE OF OWNERSHIP / CHANGE IN PURPOSE OF SUPPLY AGAINST EXISITNG CONNECTION UNDER WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( STANDARDS OF PERFORMANCE OF LICENSEES RELATING TO CONSUMER SERVICE ) REGULATIONS, 2010 AS AMENDED THEREAFTER
84. OA-419/22-23 Friday, September 23, 2022 IN REGARD TO THE APPLICATION FOR APPROVAL OF ALLOWING INTEREST AND ALLIED FINANCING CHARGES DUE TO FORECLOSURE OF TERM LOAN OF RURAL ELECTRIFICATION CORPORATION LIMITED (RECL) UTILIZING THE GOVERNMENT GRANT RECEIVED AGAINST HIGH VOLTAGE DISTRIBUTION SYSTEM (HVDS) PROJECT IN PASCHIM AND PURBA BURDWAN,BIRBHUM, 24 PARAGANAS NORTH, 24 PARAGANAS SOUTH, HOOGHLY AND PASCHIM MIDNAPUR UNDER THE JURISDICTION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) IN THE AGGREGATE REVENUE REQUIREMENT OF RELEVANT YEARS
85. OA-395/21-22 Wednesday, September 21, 2022 IN REGARD TO THE APPLICATION FOR ISSUANCE OF APPROPRIATE ORDER IN RESPECT OF APPROVAL OF ALLOWING INTEREST AND ALLIED FINANCING CHARGES DUE TO LIQUIDATION OF OUTSTANDING ARREAR DUES OF NATIONAL HYDROELECTRIC POWER CORPORATION (NHPC LIMITED) THROUGH TEMPORARY ACCOMODATION BY BILL DISCOUNTING IN THE AGGREGATE REVENUE REQUIREMENT OF RELEVANT YEARS
86. B-89/1/21-22 Thursday, September 1, 2022 ORDER IN RESPECT TO HALDIA ENERGY LIMITED FOR SUBMISSION OF TARIFF AND APR PETITIONS OF 2 X 300 MW GENERATING STATIONS AND 400 KV DOUBLE CIRCUIT DEDICATED TRANSMISSION LINE
87. C-15/993 Friday, August 12, 2022 APPLICATIONS BY SURYA ALLOY INDUSTRIES LIMITED, SEEKING INTERVENTION OF THE COMMISSION IN THE MATTER OF ARBITRARY AND UNJUSTIFIED DEMAND ON ACCOUNT OF ADDITIONAL ENERGY CHARGES DURING RESTRICTED DRAWAL PERIOD FOR THE MONTHS BETWEEN JUNE 2015 TO JULY, 2018
88. OA-245/16-17,OA-247-16-17 AND OA-285/18-19 Monday, August 1, 2022 IN THE MATTER OF APPLICATION FOR ISSUE OF PRACTICE DIRECTIONS TO ENABLE CONSUMERS TO OBTAIN 'NO DUES CERTIFICATE' FROM EXISTING LICENSEE PRIOR TO SWITCHING OVER / EXERCISING THE CHOICE OF OPEN ACCESS FROM ANOTHER PARALLEL LICENSEE / SUPPLIER.
89. B-36/ABT-9 Saturday, July 30, 2022 IN THE MATTER OF STATUS REPORT REGARDING INSTALLATION OF ABT METERS AND DC CERTIFICATION IN RESPECT OF ALL GENERATING STATIONS OF CESC LIMITED
90. OA-211/15-16 Saturday, July 30, 2022 THE PETITION FILED BY CESC LIMITED SEEKING APPROPRIATE RECOVERY PLAN FOR REIMBURSEMENT OF STATUTORY LIABILITY OF ADDITIONAL LEVY PAID FOR THE PERIOD UPTO FINANCIAL YEAR 2013-2014 WHICH FORMS PART OF THE DEMAND RAISED UNDER THE COAL MINES (SPECIAL PROVISIONS) ORDINANCE, 2014 READ WITH THE COAL MINES (SPECIAL PROVISIONS) RULES, 2014 FRAMED THEREUNDER, COAL MINES (SPECIAL PROVISIONS) SECOND ORDINANCE,2014 AND THE COAL MINE (SPECIAL PROVISIONS) ACT,2015.