1 |
IPCL |
FPPCA-129/24-25 & APR-134/24-25 |
Tuesday, January 20, 2026 |
2020-2021 |
FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) OF INDIA POWER CORPORATION LIMITED FOR THE FINANCIAL YEAR 2020-21
|
|
2 |
IPCL |
CORRIGENDUM TO APR(R)-42/24-25 |
Wednesday, December 17, 2025 |
2019-2020 |
CORRIGENDUM ORDER TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION'S ORDER DATED 20.08.2025 IN CASE NO. APR(R)-42/24-25
|
|
3 |
IPCL |
APR(R)-42/24-25 |
Wednesday, August 20, 2025 |
2019-2020 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FUEL AND POWER PURCHASE COST ADJUSTMENT AND ANNUAL PERFORMANCE REVIEW ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2019-20 ISSUED BY THE COMMISSION ON 16.08.2024 IN CASE NO. FPPCA-112/22-23 AND APR-103/22-23
|
|
4 |
IPCL |
APR(R)-40/24-25 |
Wednesday, August 20, 2025 |
2018-2019 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FUEL AND POWER PURCHASE COST ADJUSTMENT AND ANNUAL PERFORMANCE REVIEW ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2018-19 ISSUED BY THE COMMISSION ON 02.07.2024 IN CASE NO. FPPCA-111/22-23 AND APR-102/22-23
|
|
5 |
IPCL |
TP-105/22-23 |
Tuesday, January 21, 2025 |
2023-2024, 2024-2025, 2025-2026 |
IN REGARD TO THE TARIFF APPLICATION OF THE INDIA POWER CORPORATION LIMITED FOR THE YEARS 2023 - 2024 , 2024 - 2025 AND 2025 - 2026 UNDER SECTION 64(3)(A) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
6 |
IPCL |
APR(R)-34/24-25 |
Monday, January 6, 2025 |
2016-2017 |
PETITION UNDER SETION 94(1)(F) OF THE ELECTRICITY ACT, 203 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FUEL AND POWR PURCHASE COST ADJUSTMENT AND ANNUAL PERFORMANCE REVIEW ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2016-17 ISSUED BY THE COMMISSION ON 06.03.24 IN CASE NO. FPPCA-100/21-22 AND APR-88/21-22
|
|
7 |
IPCL |
APR(R)-35/24-25 |
Tuesday, November 19, 2024 |
2017-2018 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT,2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FPPCA AND APR ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2017-18 ISSUED BY THE COMMISSION ON 07.03.2024 IN CASE NO. FPPCA-105/21-22 AND APR-98/22-23
|
|
8 |
IPCL |
APR(R)-24/23-24 |
Tuesday, November 19, 2024 |
2015-2016 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT,2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FPPCA AND APR ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2015-16 ISSUED BY THE COMMISSION ON 10.07.2023 IN CASE NO. FPPCA-84/16-17 AND APR-67/17-18
|
|
9 |
IPCL |
APR(R)-22/22-23 |
Wednesday, November 6, 2024 |
2014-2015 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 20023 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2014-15 ISSUED BY THE COMMISSION ON 28.07.22 IN CASE NO. APR-60/16-17
|
|
10 |
IPCL |
TP(R)-32/21-22 |
Tuesday, October 1, 2024 |
2017-2018 |
IN REGARD TO PETITION SUBMITTED BY INDIA POWER CORPORATION LIMITED FOR REVIEW OF MYT ORDER DATED 28.01.2021 FOR THE YEAR 2017-2018 ISSUED BY THE COMMISSION IN CASE NO. TP-74/16-17
|
|
11 |
IPCL |
TP(R)-50/24-25 |
Friday, September 27, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) FOR REVIEW OF MULTI YEAR TARIFF (MYT) ORDER OF IPCL FOR THE SEVENTH CONROL PERIOD COMPRISING OF THE FINANCIAL YEARS 2020-21, 2021-22 AND 2022-23 UNDER SECTION 94(1) (F) OF THE ELECTRICITY ACT, 20023 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013
|
|
12 |
IPCL |
FPPCA-112/22-23 AND APR-103/22-23 |
Friday, August 16, 2024 |
2019-2020 |
REGARDING THE APPLICATION OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2019-20
|
|
13 |
IPCL |
FPPCA-111/22-23 AND APR-102/22-23 |
Tuesday, July 2, 2024 |
2018-2019 |
REGARDING THE APPLICATION OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2018-19
|
|
14 |
IPCL |
APR(R)-9/19-20 |
Thursday, June 13, 2024 |
2012-2013 |
PETITION UNDER SECTION 94(1)(f) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF ANNUAL PERFORMANCE REVIEW (APR) ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2012-13 ISSUED BY THE COMMISSION ON 02.12.2019 IN CASE NO. APR-41/13-14
|
|
15 |
IPCL |
TP-94/20-21 |
Wednesday, March 13, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2020-21, 2021-22 AND 2022-23 COVERING SEVENTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
16 |
IPCL |
FPPCA-105/21-22 AND APR-98/22-23 |
Thursday, March 7, 2024 |
2017-2018 |
REGARDING THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2017-18
|
|
17 |
IPCL |
FPPCA-100/21-22 AND APR-88/21-22 |
Wednesday, March 6, 2024 |
2016-2017 |
REGARDING THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2016-17
|
|
18 |
IPCL |
FPPCA-84/16-17 AND APR-67/17-18 |
Monday, July 10, 2023 |
2015-2016 |
IN REGARD TO THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2015-2016
|
|
19 |
IPCL |
APR(R)-10/20-21 |
Tuesday, December 13, 2022 |
2013-2014 |
IN REGARD TO PETITION SUBMITTED BY INDIA POWER CORPORATION LIMITED FOR REVIEW OF FUEL AND POWER PURCHASE COST ADJUSTMENT AND ANNUAL PERFORMANCE REVIEW ORDER DATED 27.11.2020 FOR THE YEAR 2013-14 ISSUED BY THE COMMISSION IN CASE NO. FPPCA-69/14-15 AND APR-47/14-15
|
|
20 |
IPCL |
TP(R)-36/21-22 |
Tuesday, December 13, 2022 |
2018-2019, 2019-2020 |
IN REGARD TO PETITION SUBMITTED BY INDIA POWER CORPORATION LIMITED FOR REVIEW OF MULTI YEAR TARIFF ORDER DATED 09.07.2021 FOR THE YEARS 2018-19 AND 2019-20 ISSUED BY THE COMMISSION IN CASE NO TP-78/18-19
|
|
21 |
IPCL |
FPPCA-76/15-16 AND APR-60/16-17 |
Thursday, July 28, 2022 |
2014-2015 |
IN REGARD TO THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFRORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2014-2015
|
|
22 |
IPCL |
TP-78/18-19 |
Friday, July 9, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEAR 2018-19 AND 2019-20 COVERING SIXTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
|
23 |
IPCL |
TP-74/16-17 |
Thursday, January 28, 2021 |
2017-2018 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEAR 2017-2018 COVERING FIFTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
24 |
IPCL |
FPPCA-69/14-15 AND APR-47/14-15 |
Friday, November 27, 2020 |
2013-2014 |
IN RE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013- 2014
|
|
25 |
IPCL |
APR- 41/13 -14 |
Monday, December 2, 2019 |
2012-2013 |
IN REGARD TO THE APPLICATION OF THE DPSC LIMITED (NOW IPCL) FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012 - 2013
|
|
26 |
IPCL |
TP(R) -26/16- 17 |
Friday, February 17, 2017 |
2016-2017 |
REVIEW OF THE TARIFF ORDER DATED 21ST JULY, 2016 PASSED BY THE COMMISSION IN CASE NO. TP-58/13-14 IN RESPECT OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016-2017 EMERGED UPON SCRUTINY OF THE SAID TARIFF ORDER
|
|
27 |
IPCL |
FPPCA – 64 / 13 – 14 |
Monday, September 12, 2016 |
2012-2013 |
APPLICATION OF INDIAN POWER CORPORATION LIMITED IN THE MATTER OF FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA)OF DPSC LIMITED (DPSCL)FOR THE FINANCIAL YEAR 2012–2013
|
|
28 |
IPCL |
TP – 58 / 13 – 14 |
Thursday, July 21, 2016 |
2014-2015, 2015-2016, 2016-2017 |
THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014-15,2015-16 AND 2016-17 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
|
29 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2013-2014 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013-2014 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
|
30 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2012-2013 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012-2013 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
|
31 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2011-2012 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011-2012 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
|
32 |
IPCL |
TP – 51 / 11 - 12 |
Thursday, December 26, 2013 |
2013-2014 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2011-2012,2012-2013 AND 2013-2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
33 |
IPCL |
APR – 33 / 12 – 13 |
Tuesday, September 10, 2013 |
2011-2012 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2011– 2012
|
|
34 |
IPCL |
FPPCA – 58 / 12 – 13 |
Thursday, July 25, 2013 |
2011-2012 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2011– 2012
|
|
35 |
IPCL |
APR – 24 / 11 – 12 |
Tuesday, March 26, 2013 |
2010-2011 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2010– 2011
|
|
36 |
IPCL |
TP – 51 / 11 - 12 |
Thursday, February 14, 2013 |
2011-2012 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2011-12,2012-13 AND 2013-14 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
37 |
IPCL |
FPPCA – 60 / 12 – 13 |
Monday, December 17, 2012 |
2010-2011 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2010–2011
|
|
38 |
IPCL |
APR – 19 / 10 – 11 |
Friday, August 24, 2012 |
2009-2010 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009–2010 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS,2011.
|
|
39 |
IPCL |
FPPCA – 44 / 10 – 11 |
Monday, June 4, 2012 |
2009-2010 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2009 – 2010 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011.
|
|
40 |
IPCL |
TP – 40/ 08 – 09 |
Friday, October 1, 2010 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 - 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS MENDED.
|
|
41 |
IPCL |
TP – 40/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 - 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS MENDED.
|
|
42 |
IPCL |
TP – 40 / 08 – 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008 – 09, 2009 – 10 AND 2010 – 11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
43 |
IPCL |
PR – 12 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
|
44 |
IPCL |
FPPCA – 34 / 09 – 10 |
Wednesday, June 30, 2010 |
2008-2009 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2008- 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
|
45 |
IPCL |
FPPCA- 28/08- 09 |
Wednesday, June 9, 2010 |
2007-2008 |
ON REMAND OF APPEAL NO: 138/09 BY THE HON’BLE APPELLATE TRIBUNAL FOR ELECTRICITY FOR THE DE NOVO DETERMINATION OF COST TO BE DISALLOWED, IF ANY, WITH REFERENCE TO PARAGRAPH 2.2.3 IN COMMISSION’S ORDER DATED 27.05.2009 IN THE REFERRED CASE RELATING TO ALLOWABLE FUEL & POWER PURCHASE COST ADJUSTMENTS FOR DPSC LIMITED FOR THE YEAR 2007-2008
|
|
46 |
IPCL |
FPPCA – 33 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF DPSC LTD FOR AD HOC INCREASE OF THE FUEL AND POWER PURCHASE COSTS INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009- 2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED.
|
|
47 |
IPCL |
TP – 40/ 08 – 09 |
Thursday, September 17, 2009 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2009 - 2010 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS)REGULATIONS, 2007.
|
|
48 |
IPCL |
TP – 40 / 08 – 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008 – 09, 2009 – 10 AND 2010 – 11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
49 |
IPCL |
APR-6/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
|
50 |
IPCL |
FPPCA – 28 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|