1 |
WBSEDCL |
APR-131/24-25 AND FPPCA-126/24-25 |
Monday, December 29, 2025 |
2023-2024 |
APPROVAL OF FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) OF WEST BENGAL ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE FY 2023--24
|
|
2 |
WBSEDCL |
APR(R)-45/24-25 |
Friday, July 11, 2025 |
2022-2023 |
APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) UNDER REGULATION 3.3 READ WITH REGULATIONS 3.10, 3.11 AND 3.13 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013, AS AMENDED FROM TIME TO TIME FOR REVIEW OF FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) ORDER DATED 09.12.2024 IN CASE NO. FPPCA-120/23-24 AND APR-117/23-24 PASSED BY THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE FINANCIAL YEAR 2022-23
|
|
3 |
WBSEDCL |
TP-98/22-23 |
Thursday, March 20, 2025 |
2025-2026 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2023-24, 2024-25 AND 2025-26 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
4 |
WBSEDCL |
FPPCA-120/23-24 AND APR-117/23-24 |
Monday, December 9, 2024 |
2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR APPROVAL OF FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2022-23
|
|
5 |
WBSEDCL |
TP-98/22-23 |
Wednesday, March 6, 2024 |
2024-2025 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2023-2024, 2024-2025 AND 2025-2026 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
6 |
WBSEDCL |
FPPCA-116/22-23 AND APR-110/22-23 |
Wednesday, April 26, 2023 |
2021-2022 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2021-2022
|
|
7 |
WBSEDCL |
APR(R)-13/21-22 |
Thursday, April 6, 2023 |
2013-2014 |
IN REGARD TO THE REVIEW PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) UNDER REGULATION 3.3 READ WITH REGULATION 3.10,3.11 AND 3.12 OF THE CONDUCT OF BUSINESS REGULATION, 2013 OF THE COMMISSION AGAINST THE ORDER DATED 14.07.2021 IN CASE NO FPPCA-70/14-15 AND APR-46/14-15
|
|
8 |
WBSEDCL |
TP-98/22-23 |
Thursday, March 30, 2023 |
2023-2024 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2023-2024,2024-2025 AND 2025-2026 UNDER SECTION 64(3)(A) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
|
9 |
WBSEDCL |
FPPCA-110/22-23 AND APR-104/22-23 |
Wednesday, March 29, 2023 |
2020-2021 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2020-21
|
|
10 |
WBSEDCL |
TP(R)-28/18-19 |
Tuesday, February 21, 2023 |
2014-2015, 2015-2016, 2016-2017 |
IN REGARD TO PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED IN PURSUANCE TO ORDER DATED 18.02.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY IN APPEAL NO. 215 OF 2015 AGAINST THE TARIFF ORDER ISSUED BY THE COMMISSION VIDE DATED 04.03.2015 IN CASE NO TP-61/13-14 FOR THE YEARS 2014-2015, 2015-16 AND 2016-2017 (MYT TARIFF) AND THE TARIFF FOR THE YEAR 2014-2015 UNDER THE FOURTH CONTROL PERIOD.
|
|
11 |
WBSEDCL |
FPPCA-75/15-16 AND APR-52/15-16 |
Wednesday, November 23, 2022 |
2014-2015 |
IN REGARD TO THE APPLICATION FOR PART RELEASE OF THE WITHHELD AMOUNT OF RS. 2556.00 CRORE UNDER THE HEAD TERMINAL BENEFIT AS PART OF THE COMPLIANCE OF THE DIRECTIVE GIVEN IN THE APR ORDER
|
|
12 |
WBSEDCL |
FPPCA-102(I)/21-22 AND APR-89(I)/21-22 |
Wednesday, September 28, 2022 |
2018-2019 |
IN REGARD TO THE APPLICATION FOR RELEASE OF RS. 1327 LAKHS ON ACCOUNT OF PRODUCTION/PERFORMANCE INCENTIVE UNDER 'EMPLOYEE COST' WITHHELD BY THE COMMISSION IN THE FPPCA AND APR ORDER FOR 2018-19.
|
|
13 |
WBSEDCL |
FPPCA-103(I)/21-22 AND APR-90(I)/21-22 |
Friday, September 23, 2022 |
2019-2020 |
APPLICATION FOR RELEASE OF RS. 1285 LAKHS ON ACCOUNT OF PRODUCTION PERFORMANCE INCENTIVE UNDER 'EMPLOYEE COST' WITHHELD BY THE COMMISSION IN THE FPPCA AND APR ORDER FOR 2019-20
|
|
14 |
WBSEDCL |
TP-89/20-21 |
Saturday, July 30, 2022 |
2022-2023 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO WBSEDCL FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2020-21 TO 2022-23 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT,2003.
|
|
15 |
WBSEDCL |
TP-89/20-21 |
Thursday, July 28, 2022 |
2022-2023 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2020-2021, 2021-2022 AND 2022-2023 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
16 |
WBSEDCL |
FPPCA-103/21-22 AND APR-90/21-22 |
Wednesday, July 27, 2022 |
2019-2020 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2019-2020
|
|
17 |
WBSEDCL |
FPPCA-102/21-22 AND APR-89/21-22 |
Wednesday, July 27, 2022 |
2018-2019 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2018-2019
|
|
18 |
WBSEDCL |
TP-89/20-21 |
Monday, March 28, 2022 |
2020-2021, 2021-2022 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2020-2021, 2021-2022 AND 2022-2023 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
|
19 |
WBSEDCL |
FPPCA-90/17-18 AND APR-70/18-19 |
Wednesday, March 16, 2022 |
2017-2018 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2017-2018
|
|
20 |
WBSEDCL |
FPPCA-87/17-18 AND APR-63/17-18 |
Wednesday, February 9, 2022 |
2016-2017 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2016-2017
|
|
21 |
WBSEDCL |
FPPCA-80/16-17 AND APR-55/16-17 |
Thursday, February 3, 2022 |
2015-2016 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2015-2016
|
|
22 |
WBSEDCL |
TP(R)-28/18-19 |
Wednesday, January 19, 2022 |
2014-2015, 2015-2016, 2016-2017 |
IN THE MATTER OF PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITE IN PURSUANCE TO ORDER DATED 18.02.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY IN APPEAL NO. 215 OF 2015 AGAINST THE TARIFF ORDER ISSUED BY THE COMMISSION VIDE DATED 04.03.2015 IN CASE NO. TP-61/13-14 FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 (MYT TARIFF) AND THE TARIFF FOR THE YEAR 2014-2015 UNDER THE FOURTH CONTROL PERIOD
|
|
23 |
WBSEDCL |
APR(R)-7/18-19 |
Friday, November 12, 2021 |
2011-2012 |
IN REGARD TO THE APPLICATION FOR REVIEW UNDER REGULATION 3.3. READ WITH REGULATION 3.10,3.11 AND 3.12 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 AGAINST THE ORDER IN CASE NO. APR-35/12-13 DATED 09.09.2013 REGARDING THE ANNUAL PERFORMANCE REVIEW OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FY 2011-12 IN PURSUANT TO ORDER DATED 28.11.2018 IN APPEAL 267 OF 2015 PASSED BY HON'BLE APPELLATE TRIBUNAL FOR ELECTRICITY
|
|
24 |
WBSEDCL |
FPPCA-75/15-16 AND APR-52/15-16 |
Wednesday, November 3, 2021 |
2014-2015 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2014-2015
|
|
25 |
WBSEDCL |
APR(R)-7/18-19 |
Thursday, October 7, 2021 |
2011-2012 |
IN REGARD TO THE PETITION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 09.09.2013NFOR THE YEAR 2011-2012 IN CASE NO APR-35/12-13 IN TERMS OF REGULATION 3.3. READ WITH REGULATIONS 3.10,3.11 AND 3.12 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS) REGULATIONS,2013
|
|
26 |
WBSEDCL |
TP-84/19-20 |
Wednesday, August 25, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2018-2019 AND 2019-2020 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
|
27 |
WBSEDCL |
TP(R)-28/18-19 |
Monday, August 2, 2021 |
2014-2015, 2015-2016, 2016-2017 |
IN THE MATTER OF PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED IN PURSUANCE TO ORDER DATED 18.02.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY IN APPEAL NO. 215 OF 2015 AGAINST THE TARIFF ORDER ISSUED BY THE COMMISSION VIDE DATED 04.03.2015 IN CASE NO. TP-61/13-14 FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 (MYT TARIFF) AND THE TARIFF FOR THE YEAR 2014-2015 UNDER THE FOURTH CONTROL PERIOD
|
|
28 |
WBSEDCL |
FPPCA-70/14-15 AND APR 46/14-15 |
Wednesday, July 14, 2021 |
2013-2014 |
IN RE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014
|
|
29 |
WBSEDCL |
APR(R)-8/18-19(II) |
Friday, May 21, 2021 |
2012-2013 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR REVIEW PETITION UNDER REGULATION 3.3 READ WITH REGULATIONS 3.10,3.11 AND 3.12 OF THE WBERC ( CONDUCT OF BUSINESS) REGULATIONS, 2013 AGAINST THE ORDER IN CASE NO APR-38/13-14 DATED 12.06.2014 REGARDING APR OF WBSEDCL FOR THE FINANCIAL YEAR 2012-13.
|
|
30 |
WBSEDCL |
TP – 65 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2017 – 2018 COVERING FIFTH CONTROL PERIOD UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
|
31 |
WBSEDCL |
TP – 61 / 13 – 14 |
Friday, October 28, 2016 |
2016-2017 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
32 |
WBSEDCL |
TP - 61 / 13-14 |
Friday, October 30, 2015 |
2013-2014 |
IN RE THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015 - 2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003 .
|
|
33 |
WBSEDCL |
TP – 61 / 13 – 14 |
Monday, August 10, 2015 |
2015-2016 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
34 |
WBSEDCL |
TP – 61 / 13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
35 |
WBSEDCL |
APR – 38 / 13 – 14 |
Thursday, June 12, 2014 |
2012-2013 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012–2013.
|
|
36 |
WBSEDCL |
FPPCA – 66 / 13 – 14 |
Tuesday, March 4, 2014 |
2012-2013 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013
|
|
37 |
WBSEDCL |
TP – 53 / 11 – 12 |
Monday, March 3, 2014 |
2013-2014 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013– 2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
|
38 |
WBSEDCL |
TP – 53 / 11 – 12 |
Thursday, December 26, 2013 |
2013-2014 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2011-2012, 2012-2013 AND 2013-2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
39 |
WBSEDCL |
APR – 35 / 12 – 13 |
Monday, September 9, 2013 |
2011-2012 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2011– 2012.
|
|
40 |
WBSEDCL |
FPPCA – 63 / 12 – 13 |
Tuesday, July 23, 2013 |
2011-2012 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2011-2012
|
|
41 |
WBSEDCL |
TP – 53 / 11 – 12 |
Thursday, April 11, 2013 |
2011-2012 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011– 2012 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
|
42 |
WBSEDCL |
TP – 53 / 11 – 12 |
Thursday, April 11, 2013 |
2012-2013 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012–2013 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
|
43 |
WBSEDCL |
TP – 53 / 12 – 13 |
Saturday, December 1, 2012 |
2011-2012 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2011 – 2012, 2012 – 2013 AND 2013 – 2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
44 |
WBSEDCL |
APR – 29 / 12 – 13 |
Friday, October 19, 2012 |
2010-2011 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2010 – 2011.
|
|
45 |
WBSEDCL |
APR – 20 / 10 – 11 |
Wednesday, October 17, 2012 |
2009-2010 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009 – 2010.
|
|
46 |
WBSEDCL |
FPPCA – 57 / 11 – 12 |
Wednesday, October 3, 2012 |
2010-2011 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2010-2011
|
|
47 |
WBSEDCL |
TP – 41 / 08 – 09 |
Friday, December 30, 2011 |
2010-2011 |
THE APPLICATION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR RE-DETERMINATION OF TARIFF FOR THE YEAR 2010-11 PURSUANT TO THE DIRECTION OF THE HON’BLE APPELLATE TRIBUNAL FOR ELECTRICITY GIVEN IN THE ORDER DATED 04.04.2011 IN IA NO.62 OF 2011 IN APPEAL NO.173 OF 2010
|
|
48 |
WBSEDCL |
TP – 41/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 – 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS MENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS AMENDED.
|
|
49 |
WBSEDCL |
TP – 41 / 08 – 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
|
50 |
WBSEDCL |
APR – 16 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|